New energy and battery manufacturing
Coating rolls, stacking tables, module fixtures, cell assembly lines and PV modules.
Methods
- Roll parallelism
- Stacking table flatness
- Module fixture flatness
- Module mounting angle
Procedure
- Establish datum
- Roll parallelism
- Table flatness
- Fixture re-check
- Line acceptance
Geometric checks do not replace electrical, coating-thickness or weld-strength testing.
Typical measurement scenarios in this industry
Each scenario gives the object, tolerance range and method, ready to take to the selector.
Coating and backing roll parallelism
Rolls 1.2–1.8 m long, end-to-end centre difference often ≤ 20 μm. Read both ends and adjust housings.
General-purpose electronic autocollimators↗Stacking table flatness and level
400×400 mm table, typically 10 μm class; grid measurement with minimum-zone evaluation.
General-purpose electronic autocollimators↗Module fixture flatness and hole position
600×300 mm fixture, 20 μm flatness and ±0.05 mm holes; measure the face before holes.
General-purpose electronic autocollimators↗PV tracker mounting angle
Tracker elevation often within 0.2°; check several points, not just one.
General-purpose electronic autocollimators↗Understand the measurement step by step
- 01
Establish datum
- 02
Roll parallelism
- 03
Table flatness
- 04
Fixture re-check
- 05
Line acceptance
- Establish datum
- Roll parallelism
- Table flatness
- Fixture re-check
- Line acceptance
Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.
Geometric control path on a battery-module line
Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.
Example task
Teaching note: stack assembly, coating and welding fixtures are sensitive to flatness, parallelism and positioning, while line takt demands fast, traceable in-line checks.
Setup and preparation
Split the need by station: roller parallelism, stack-platform flatness, weld-fixture location, module outline.
Give every station one reproducible datum and one acceptable takt; do not move a metrology-lab setup onto the line.
Place offline re-checks after changeover, roller change or fixture repair, not on a calendar.
Keep raw angle or displacement readings, not just pass/fail flags.
Interpretation
The payoff shows up as scrap rate and changeover time, not as a single precision figure.
Verification and pitfalls
Under takt pressure, settling and cleaning are the first steps dropped — both bias results.
Verify in-line gauges with a reference artefact and archive the record with production data.
Why this method
Most error comes from heat and clamping, not from instrument resolution; fix datum and thermal state first.
Evaluation boundary
Acceptance follows the agreed measurement plan and sampling rate; one good part is not a batch result.