Power generation equipment
Steam turbines, generators, wind main shafts, hydro units and transformer foundations.
Methods
- Bearing housing coaxiality
- Foundation level
- Flange parallelism
- Long shaft alignment
Procedure
- Foundation acceptance
- Bearing housing alignment
- Shaft train alignment
- Coupling alignment
- Re-check after run-in
Cold alignment must be corrected by the thermal growth curve; it is not the running condition.
Typical measurement scenarios in this industry
Each scenario gives the object, tolerance range and method, ready to take to the selector.
Turbine bearing housing coaxiality
Housings 3–8 m apart, cold alignment 0.02–0.05 mm; add rotor sag and thermal growth.
General-purpose electronic autocollimators↗Large equipment foundation level
Foundations over 10 m, typically 0.05 mm/m; coarse-level feet before the optical datum.
General-purpose electronic autocollimators↗Wind tower flange parallelism
Flanges 2–4 m diameter, parallelism 0.3–0.5 mm; mark local highs.
General-purpose electronic autocollimators↗Understand the measurement step by step
- 01
Foundation acceptance
- 02
Bearing housing alignment
- 03
Shaft train alignment
- 04
Coupling alignment
- 05
Re-check after run-in
- Foundation acceptance
- Bearing housing alignment
- Shaft train alignment
- Coupling alignment
- Re-check after run-in
Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.
Large-scale geometric inspection for power equipment
Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.
Example task
Teaching note: turbines, generators, transformers and wind components are large, warm up in service and are expensive to dismantle; the plan must be field-capable and traceable.
Setup and preparation
Separate cold and hot states: hot for diagnosis, cold for acceptance; limits are not interchangeable.
Align long spans with an autocollimator plus turning mirror, or fit a datum axis from laser-tracker points.
Log support and foundation loads with the temperature field so thermal deflection is not read as geometry error.
Re-measure key items within the outage window and keep before/after data at identical points.
Interpretation
Before/after data at identical points say more about an adjustment than any single measurement.
Verification and pitfalls
Check air turbulence on long paths; shorten the path or use a tube.
Record the number and position of turning mirrors or the result is not reproducible.
Why this method
Tolerances are often given per metre, so the span must be recorded or the limit cannot be scaled.
Evaluation boundary
Acceptance follows the equipment agreement and maintenance rules; hot data serve trending only.