MICROCRE / OPTICAL METROLOGY400-812-7833  ·  SHANGHAI
研润 WHW
MICROCREPRECISION IN EVERY ANGLE
Home / Levelling and datum establishment
MEASUREMENT METHOD

Levelling and datum establishment

Establish a stable level and mounting datum so installation tilt is not mistaken for guideway form error.

Principle

A level measures angle to gravity; an autocollimator measures angle to the optical axis. They are different datums.

Preparation

Confirm feet, shims and grouting; allow the specified settling and preload. Record temperature and floor vibration.

Workflow diagram

01Check feet02Coarse level03Multi-point check04Set optical datum05Record and re-check

Procedure

  1. Load the feet as specified and check shim contact and preload.
  2. Coarse-level in both directions with an electronic level.
  3. Re-check at several positions to separate overall tilt from local twist.
  4. Establish the optical datum with an autocollimator and record zero and sign convention.
  5. File the levelling record, foot load state and re-check date.

Calculation

1 mm/m ≈ 206.3″; 1″ ≈ 4.85 μm/m. Height difference = reading difference × span.

Illustrative example

Schematic · not measured data
Schematic: overall tilt versus local twist.

Example: 0.02 mm/m and 0.01 mm/m correspond to about 4.1″ and 2.1″, or 40 μm and 20 μm over 2 m.

Limitations

  • Treating overall tilt as straightness error.
  • Levelling one direction only and missing twist.
  • Measuring before the structure has settled.

Reporting

Retain raw data, datum definition, temperature, repeatability, algorithm and uncertainty. Illustrations are not test results.

STEP BY STEP

Understand the measurement step by step

Principle schematic · not to scale
1 / 5
  1. Step 1 · Load the feet as specified and check shim contact and preload.
  2. Step 2 · Coarse-level in both directions with an electronic level.
  3. Step 3 · Re-check at several positions to separate overall tilt from local twist.
  4. Step 4 · Establish the optical datum with an autocollimator and record zero and sign convention.
  5. Step 5 · File the levelling record, foot load state and re-check date.

Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.

WORKED EXAMPLE

Worked pre-levelling example on a 2000 mm bed

Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.

Example task

Teaching example: a 2000 mm bed read with a 0.01 mm/m electronic level over five 500 mm bays; each reading is integrated into a height curve to separate overall slope from local waviness. Readings are synthetic.

Setup and preparation

  • Load the feet as specified and check shim contact and preload.

  • Coarse-level in both directions with an electronic level.

  • Re-check at several positions to separate overall tilt from local twist.

  • Establish the optical datum with an autocollimator and record zero and sign convention.

Example data and records

  • Bay slope in mm/m: +0.05, +0.03, +0.01, -0.01, -0.03.

  • Height per bay: 25, 15, 5, −5, −15 µm.

  • Accumulated curve: 25, 40, 45, 40, 25 µm from zero at the start.

Calculation steps

Height per bay = reading(mm/m) × length(m) × 1000, e.g. 0.05 × 0.5 × 1000 = 25 µm. Peak-to-valley of the accumulated curve is 20 µm, about 0.01 mm/m over 2 m.

Interpretation

The curve rises then falls: an overall slope of 0 µm plus a mid-span hump. Remove the overall slope with shims first, then correct the local shape.

Verification and pitfalls

  • Let the level settle at each station; re-settle after moving, never read while sliding.

  • Separate longitudinal and transverse curves; they need independent datums.

  • Re-measure the same stations and keep both before/after data sets.