Surface plate flatness inspection plan
For macroscopic plates, tables and mounting surfaces. Slope integration and direct height measurements require different data inputs.
Instruments
- Angular or height system matched to area and tolerance
- Defined supports and sampling grid
- Shared nodes, closure checks and environment records
Procedure
- Define coordinates, useful area, supports and direct-height measurement. The nine-point grid is illustrative; actual density must reflect the risk of local surface features.
- Set nodes where x and y each equal 0, 100 or 200 mm, record a common height reference and keep supports unchanged.
- Acquire all nine heights while rechecking one fixed reference. Multi-line systems must unify datums before producing this type of height matrix.
- Fit the least-squares plane z=ax+by+c and subtract its height at each node to obtain nine signed residuals.
- Plot the grid and residual map, identify extreme points and unsampled regions; do not invent measured detail between nodes.
- Deliver raw coordinates, fitted coefficients, residuals, algorithm, coverage limits and uncertainty. Use a separate appropriate evaluation if the contract requires minimum-zone flatness.
Calculation
Slope readings require integration and a common reference across lines. Direct heights use point coordinates. Least-squares plane residual peak-to-valley must not be labelled minimum-zone flatness.
Reporting
- Supports remain unchanged
- Lines share one height reference
- Sampling covers critical regions
Limitations
Sparse sampling may miss local defects. This plan does not replace optical interferometry or roughness measurement.
Understand the measurement step by step
- 01
Define coordinates, useful area, supports and direct-height measurement. The nine-point grid is illustrative; actual density must reflect the risk of local surface features.
- 02
Set nodes where x and y each equal 0, 100 or 200 mm, record a common height reference and keep supports unchanged.
- 03
Acquire all nine heights while rechecking one fixed reference. Multi-line systems must unify datums before producing this type of height matrix.
- 04
Fit the least-squares plane z=ax+by+c and subtract its height at each node to obtain nine signed residuals.
- 05
Plot the grid and residual map, identify extreme points and unsampled regions; do not invent measured detail between nodes.
- 06
Deliver raw coordinates, fitted coefficients, residuals, algorithm, coverage limits and uncertainty. Use a separate appropriate evaluation if the contract requires minimum-zone flatness.
- Define measurement model · Define coordinates, useful area, supports and direct-height measurement. The nine-point grid is illustrative; actual density must reflect the risk of local surface features.
- Set nine-point grid · Set nodes where x and y each equal 0, 100 or 200 mm, record a common height reference and keep supports unchanged.
- Acquire common-datum heights · Acquire all nine heights while rechecking one fixed reference. Multi-line systems must unify datums before producing this type of height matrix.
- Fit plane and residuals · Fit the least-squares plane z=ax+by+c and subtract its height at each node to obtain nine signed residuals.
- Show sampling limits · Plot the grid and residual map, identify extreme points and unsampled regions; do not invent measured detail between nodes.
- Deliver model and data · Deliver raw coordinates, fitted coefficients, residuals, algorithm, coverage limits and uncertainty. Use a separate appropriate evaluation if the contract requires minimum-zone flatness.
Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.
3×3 table grid: teaching surface form after removing overall tilt
Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.
Example task
Teaching demonstration, not a real customer project. Nine direct-height points on a 200 mm×200 mm area illustrate least-squares plane fitting. They already share one height datum; this is a direct-height model, not angular readings treated as heights. A sparse teaching grid cannot establish complete table acceptance.
Setup and preparation
Define coordinates, useful area, supports and direct-height measurement. The nine-point grid is illustrative; actual density must reflect the risk of local surface features.
Set nodes where x and y each equal 0, 100 or 200 mm, record a common height reference and keep supports unchanged.
Acquire all nine heights while rechecking one fixed reference. Multi-line systems must unify datums before producing this type of height matrix.
Fit the least-squares plane z=ax+by+c and subtract its height at each node to obtain nine signed residuals.
Plot the grid and residual map, identify extreme points and unsampled regions; do not invent measured detail between nodes.
Deliver raw coordinates, fitted coefficients, residuals, algorithm, coverage limits and uncertainty. Use a separate appropriate evaluation if the contract requires minimum-zone flatness.
Example data and records
Coordinates x and y each take 0, 100 and 200 mm.
Height rows at y=0, 100, 200 mm (μm): [1,−1,3]; [0,7,2]; [5,3,7].
All heights are synthetic and already share a datum.
Calculation steps
The least-squares plane is z=0.01x+0.02y+0, with z in μm and x,y in mm. Residual rows are [1,−2,1]; [−2,4,−2]; [1,−2,1] μm. Their mean and first moments with x and y are zero. Sampled residual peak-to-valley=4−(−2)=6 μm.
Interpretation
The nine-point residual peak-to-valley relative to the least-squares plane is 6 μm. It is a result for this algorithm and grid, not automatically minimum-zone flatness or proof that unsampled regions are defect-free.
Verification and pitfalls
All points must share one height datum; independently zeroed rows cannot simply be stitched together.
Support and load changes can alter form; retain the prescribed and documented state.
Surface form, surface roughness and optical wavefront quality are separate tasks.