Additive build platform and gantry accuracy

Substrate flatness, powder-bed plane and gantry motion directly affect layer thickness uniformity.

Instruments

Procedure

Calculation

Layer margin ≈ substrate flatness + gantry straightness + drift + recoater error; state whether RSS or worst case.

Reporting

Limitations

Substrates warp during thermal cycles; cold measurement is not the build state.

STEP BY STEP

Understand the measurement step by step

  1. 01

    Confirm substrate size, preheat state and recoater travel.

  2. 02

    Measure substrate flatness and mounting-face parallelism after stabilisation.

  3. 03

    Check gantry straightness and synchronisation for powder uniformity.

  4. 04

    Record change across thermal cycles and decide on compensation.

  5. 05

    Report substrate map, gantry error and recommended layer margin.

Principle schematic · not to scale
1 / 5
  1. Step 1 · Confirm substrate size, preheat state and recoater travel.
  2. Step 2 · Measure substrate flatness and mounting-face parallelism after stabilisation.
  3. Step 3 · Check gantry straightness and synchronisation for powder uniformity.
  4. Step 4 · Record change across thermal cycles and decide on compensation.
  5. Step 5 · Report substrate map, gantry error and recommended layer margin.

Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.

WORKED EXAMPLE

Worked build-plate and layer allowance example

Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.

Example task

Teaching example: nominal layer 50 µm against plate flatness 30 µm, gantry straightness 15 µm and thermal drift 10 µm combined in quadrature.

Setup and preparation

  • Confirm substrate size, preheat state and recoater travel.

  • Measure substrate flatness and mounting-face parallelism after stabilisation.

  • Check gantry straightness and synchronisation for powder uniformity.

  • Record change across thermal cycles and decide on compensation.

Example data and records

  • Combined requirement 35 µm, i.e. 70% of the nominal layer.

  • Remaining allowance 15 µm for recoating and melt-pool variation.

  • Worst-case addition would demand 55 µm and exceed the layer.

Calculation steps

RSS = √(30² + 15² + 10²) = 35 µm; worst case is 55 µm. Agree the combination rule in advance.

Interpretation

Quadrature leaves margin, worst case does not: slow down or adjust layer thickness at the first layer and at the edges.

Verification and pitfalls

  • Measure the plate after clamping; clamping changes the form.

  • Drift grows with time; size the allowance for the longest build.

  • Layer thickness and recoater accuracy are separate figures.