Installation verticality inspection plan for elevator guide rails

For installation verticality of elevator T-rails (60 m shaft, example/teaching data) and sampling of joint steps. The autocollimator establishes the reference path from the pit, each rail section is measured in angle and compared with the shaft plumb reference, with densified stations at joints.

Instruments

Procedure

Calculation

Integrate Δh=L·tanθ into lateral offset; per-section verticality is the offset difference between section ends. With L=250 mm, 1″≈1.212 μm (example/teaching data); joint steps are read directly from densified station height differences and corroborated by the feeler gauge.

Reporting

Limitations

Does not cover car running dynamics, noise or rail lubrication state; under shaft draughts and large temperature differences, shorten each measuring section and state the environment window.

STEP BY STEP

Understand the measurement step by step

  1. 01

    Confirm the shaft segmentation (5 m sections, example), the plumb reference method and the verticality evaluation agreement.

  2. 02

    Set up the autocollimator in the pit aimed at the first rail section mirror; work upward section by section to the top landing.

  3. 03

    Read pitch/yaw along each rail face at a 250 mm span to 0.1″.

  4. 04

    Splice adjacent sections with one overlapping span and integrate via Δh=L·tanθ into the full-height lateral offset profile.

  5. 05

    Compare with the shaft plumb reference points and convert to per-section verticality.

  6. 06

    Densify stations at rail joints and measure joint steps with a feeler gauge.

  7. 07

    Deliver the full-height verticality curve, section data, joint step records and adjustment advice.

Principle schematic · not to scale
1 / 5
  1. Vertical fixing · Teaching rail fixed vertically on the stand.
  2. Vertical axis · Optical axis set vertically upward.
  3. Slider climbs · The 250 mm slider steps upward.
  4. Log tilts · Normal tilts recorded per segment.
  5. Plumbness evaluation · Cumulative conversion gives plumbness.

Teaching animation: follow the stations and reference directions. Do not read dimensions or angles from the schematic.

WORKED EXAMPLE

Elevator Guide Rail Plumbness Inspection · Tutorial Case

Teaching example with assumed data, not a customer project, instrument accuracy claim or acceptance result.

Example task

Teaching demonstration, not a real customer project: plumbness survey of an elevator guide rail in 250 mm segments; data are instructional settings.

Setup and preparation

  • Fix the teaching rail section vertically on the stand

  • Place the autocollimator at the rail base with a vertical optical axis

  • Step a 250 mm slider upward along the rail

  • Record the rail-face normal tilt per segment

  • Cumulate and convert for plumbness results

Example data and records

  • Bridge span L=250 mm; segment 1 autocollimator reading θ₁=-0.6″

  • Segment 2 autocollimator reading θ₂=-0.6″

  • Segment 3 autocollimator reading θ₃=+1.2″

Calculation steps

Height conversion: Δh = L·tan(θ·π/648000)×1000 (μm). Segment 1: 250×tan(-0.6″)=-0.73 μm; Segment 2: 250×tan(-0.6″)=-0.73 μm; Segment 3: 250×tan(+1.2″)=+1.45 μm. Cumulative heights: 0→-0.73→-1.46→-0.01 μm; peak-to-valley PV=+0.00−(-1.46)=+1.46 μm.

Interpretation

Tutorial result PV≈1.46 μm, demonstrating segmented measurement of rail plumbness.

Verification and pitfalls

  • Slider rollers seat well on the rail face

  • No rail support movement during readings

  • Survey front and side rail faces separately