Principle
With a stable system and fixed stations, distribution changes reflect machine state; control charts separate random from systematic drift.
Preparation
Fix stations, instrument, brackets and time window; define a baseline and change limits.
Workflow diagram
Procedure
- Install permanent markers and repeatable mounts at key positions.
- Re-measure at a fixed interval, sequence and environmental window.
- Log temperature, humidity, vibration and operator.
- Use control charts or trend lines to judge natural variation.
- Trigger maintenance beyond limits and keep before/after data.
Calculation
Set limits from baseline mean and standard deviation (±2σ warning, ±3σ alarm); drift rate is the trend slope.
Illustrative example
Example: baseline 4.2″ with σ = 0.6″; five points above 5.4″ indicate a systematic shift.
Limitations
- Changing stations or brackets invalidates the trend.
- Comparing across seasons misleads.
- Reacting to one outlier causes over-adjustment.
Reporting
Retain raw data, datum definition, temperature, repeatability, algorithm and uncertainty. Illustrations are not test results.